• HOME
  • NEWS
  • EXPLORE
    • CAREER
      • Companies
      • Jobs
    • EVENTS
    • iGEM
      • News
      • Team
    • PHOTOS
    • VIDEO
    • WIKI
  • BLOG
  • COMMUNITY
    • FACEBOOK
    • INSTAGRAM
    • TWITTER
Monday, September 15, 2025
BIOENGINEER.ORG
No Result
View All Result
  • Login
  • HOME
  • NEWS
  • EXPLORE
    • CAREER
      • Companies
      • Jobs
        • Lecturer
        • PhD Studentship
        • Postdoc
        • Research Assistant
    • EVENTS
    • iGEM
      • News
      • Team
    • PHOTOS
    • VIDEO
    • WIKI
  • BLOG
  • COMMUNITY
    • FACEBOOK
    • INSTAGRAM
    • TWITTER
  • HOME
  • NEWS
  • EXPLORE
    • CAREER
      • Companies
      • Jobs
        • Lecturer
        • PhD Studentship
        • Postdoc
        • Research Assistant
    • EVENTS
    • iGEM
      • News
      • Team
    • PHOTOS
    • VIDEO
    • WIKI
  • BLOG
  • COMMUNITY
    • FACEBOOK
    • INSTAGRAM
    • TWITTER
No Result
View All Result
Bioengineer.org
No Result
View All Result
Home NEWS Science News Biology

Study finds big savings in removing dams over repairs

Bioengineer by Bioengineer
May 29, 2018
in Biology
Reading Time: 2 mins read
0
Share on FacebookShare on TwitterShare on LinkedinShare on RedditShare on Telegram

A new study by Portland State University researchers finds billions of dollars could be saved if the nation's aging dams are removed rather than repaired, but also suggests that better data and analysis is needed on the factors driving dam-removal efforts.

The study, published online in May in the journal River Research and Applications, analyzed the best available national data to compare the trends and characteristics of dams that have been removed with those that remain standing.

The researchers expect that if trends continue, by 2050, between 4,000 and 36,000 dams will be removed.

The study found that a high-end cost estimate of removing 36,000 dams would be roughly $25.1 billion, a significant savings over the estimated rehabilitation costs.

The American Society of Civil Engineers estimates more than $45 billion would be needed to repair and upgrade roughly 2,170 high-hazard dams – those that pose the greatest threat to life and property if they fail. The Association of State Dam Safety Officials estimates it would cost $64 billion to rehabilitate all of the U.S. dams that need to be brought up to safe condition, according to the study.

"I think it's time for a re-invigorated public process around managing the risks dams and aging dam infrastructure pose to public safety throughout the U.S.," said Zbigniew Grabowski, a Ph.D. candidate in PSU College of Liberal Arts and Science's Earth, Environment & Society program and the study's lead author. "It's difficult to assess the actual public safety hazards and the most cost-effective ways of mitigating those hazards because the data on dams and dam removals has not been systematically compiled in a way that allows for robust analysis by government agencies or independent researchers."

The study found that hydroelectric and water-supply dams were the types most disproportionately removed, a finding that suggests more nuanced conversations about what drives the removal of dams is necessary.

Grabowski said the choice between removing or rehabilitating dams is often framed as a cost-benefit tradeoff between the ecological, social and economic impacts of dams.

"Yet we should also be looking at how including the public in dam safety decisions might increase the number of dams that don't make sense to rehabilitate," he said.

Among the study's recommendations:

-More detailed data needs to be made public and data collection on removed and rehabilitated dams needs to be standardized to allow for more robust comparative research and better-informed decisions at the national, state and local levels

-Dam policy officials and researchers need to take an interdisciplinary approach and draw knowledge from dam safety engineering, ecological restoration, social science and technology as well as the communities affected by dams and their removals

###

The study's other authors were Heejun Chang, a geography professor, and Elise Granek, an environmental science and management professor. They are both faculty fellows at PSU's Institute for Sustainable Solutions.

Media Contact

Zbigniew Grabowski
[email protected]

http://www.pdx.edu

http://dx.doi.org/10.1002/rra.3283

Share12Tweet7Share2ShareShareShare1

Related Posts

blank

Extraction Methods Impact Idesia Polycarpa Oil Quality

September 13, 2025

Evaluating Rohu Fry Transport: Key Water Quality Insights

September 13, 2025

Unveiling Arabidopsis Aminotransferases’ Multi-Substrate Specificity

September 13, 2025

Evaluating Energy Digestibility in Quail Feed Ingredients

September 12, 2025
Please login to join discussion

POPULAR NEWS

  • blank

    Breakthrough in Computer Hardware Advances Solves Complex Optimization Challenges

    154 shares
    Share 62 Tweet 39
  • New Drug Formulation Transforms Intravenous Treatments into Rapid Injections

    116 shares
    Share 46 Tweet 29
  • Physicists Develop Visible Time Crystal for the First Time

    66 shares
    Share 26 Tweet 17
  • A Laser-Free Alternative to LASIK: Exploring New Vision Correction Methods

    49 shares
    Share 20 Tweet 12

About

We bring you the latest biotechnology news from best research centers and universities around the world. Check our website.

Follow us

Recent News

Transforming Women in Pediatric Radiology: Collaboration Over Competition

Insect, Bacterial, Fungal Life on Sus scrofa Carrion

Nanoscale All-Optical Polarization Modulation via Nonlinear Interferometry

  • Contact Us

Bioengineer.org © Copyright 2023 All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Homepages
    • Home Page 1
    • Home Page 2
  • News
  • National
  • Business
  • Health
  • Lifestyle
  • Science

Bioengineer.org © Copyright 2023 All Rights Reserved.