• HOME
  • NEWS
  • EXPLORE
    • CAREER
      • Companies
      • Jobs
    • EVENTS
    • iGEM
      • News
      • Team
    • PHOTOS
    • VIDEO
    • WIKI
  • BLOG
  • COMMUNITY
    • FACEBOOK
    • INSTAGRAM
    • TWITTER
Sunday, August 3, 2025
BIOENGINEER.ORG
No Result
View All Result
  • Login
  • HOME
  • NEWS
  • EXPLORE
    • CAREER
      • Companies
      • Jobs
        • Lecturer
        • PhD Studentship
        • Postdoc
        • Research Assistant
    • EVENTS
    • iGEM
      • News
      • Team
    • PHOTOS
    • VIDEO
    • WIKI
  • BLOG
  • COMMUNITY
    • FACEBOOK
    • INSTAGRAM
    • TWITTER
  • HOME
  • NEWS
  • EXPLORE
    • CAREER
      • Companies
      • Jobs
        • Lecturer
        • PhD Studentship
        • Postdoc
        • Research Assistant
    • EVENTS
    • iGEM
      • News
      • Team
    • PHOTOS
    • VIDEO
    • WIKI
  • BLOG
  • COMMUNITY
    • FACEBOOK
    • INSTAGRAM
    • TWITTER
No Result
View All Result
Bioengineer.org
No Result
View All Result
Home NEWS Science News

Sandia weapons program meets safety, design requirements

Bioengineer by Bioengineer
June 29, 2020
in Science News
Reading Time: 3 mins read
0
Share on FacebookShare on TwitterShare on LinkedinShare on RedditShare on Telegram

Review shows B61-12 Life Extension Program work can move forward confidently

IMAGE

Credit: Photo by Randy Montoya, Sandia National Laboratories

ALBUQUERQUE, N.M. — Sandia National Laboratories has successfully completed another milestone in the B61-12 gravity bomb refurbishment program, demonstrating the labs is meeting important nuclear safety and use-control requirements.

“The Combined Engineering Judgment is an important step toward ensuring the B61-12 Life Extension Program is on track, and Sandia is meeting design and development requirements for the weapon to take its place as part of the U.S. nuclear deterrent,” said Sandia’s Delegated Chief Engineer for Nuclear Weapons Ernie Wilson.

The Combined Engineering Judgment review was conducted by Wilson and the labs’ Mission Assurance Associate Labs Director Mark Sellers and presented to Labs Director James Peery in April.

Sandia is the design and engineering lab for non-nuclear components of the nation’s nuclear stockpile, including the B61-12. In addition, Sandia serves as the technical integrator for the complete weapon, assuring that the system meets requirements as one unit and not just as individual parts.

B61-12 data continuously evaluated

The successful review was based on qualification evidence presented from an independent internal assessment by Sandia’s Weapons Assessment Team that has been evaluating data from day one of B61-12 Life Extension Program.

A life extension program allows scientists and engineers to address the aging of nuclear weapons components by requalifying usable parts, remanufacturing old parts using the original specifications or redesigning parts with modern technology when the original technology is no longer available.

“It’s that enormous amount of data that gives us confidence to execute this review and continue moving forward,” said Scott Lindblom, a Sandia qualification manager in the B61-12 program at the time and now a senior manager. “This successful review validates Sandia’s work on the B61-12 LEP up to now, and it brings in an independent review team to say, ‘Yes, really, really you are doing the right things.'”

The Weapons Assessment Team is a group of about 10 Sandia weapons experts brought together to do an internal review of the weapons system that is independent from the design, development and testing teams, said Todd Simmermacher, a Sandia nuclear safety assessment manager. The team’s work reviewing and assessing the design and qualification data is continuous from the beginning of the program.

That qualification data come from tests of the whole weapon system and each component to ensure everything always works when authorized by the president and never under any other circumstances.

“The team is constantly reviewing and assessing the design and data to the best of our ability as the weapon’s team produces it,” Simmermacher said. “The B61-12 evidence showed that the system is meeting its safety and security requirements.”

Design will extend bomb’s service life by decades

Impact, vibration, drops, extreme temperatures and massive electrical impulses are some of the physical tests conducted to show a component and the entire B61-12 weapon system will operate as intended. Combining hours of computational analysis and advanced computer algorithms with that field-testing, including flight tests, ensures components, systems and warhead integration are safe and secure enough to prevent unplanned detonations or unauthorized use of the weapon.

The B61 first entered service 50 years ago. Numerous modifications have been made since to increase safety and reliability. The B61-12 consolidates and replaces most of the previous variants, will extend the bomb’s service life by at least 20 years, and will continue to ensure its safety, security and effectiveness. The National Nuclear Security Administration plans to produce the first unit of the B61-12 in fiscal year 2022.

Sandia’s Combined Engineering Judgment review has added a high degree of confidence in the B61-12 engineering and design, Lindblom said.

It was the second such review and showed that the gaps identified earlier had been closed, he said. “Nothing was a surprise, and Sandia is moving forward on the B61-12 LEP with trusted data and design.”

###

Media Contact
Michael J. Baker
[email protected]

Original Source

https://share-ng.sandia.gov/news/resources/news_releases/engineering_judgement/

Tags: Electrical Engineering/ElectronicsMechanical EngineeringTechnology/Engineering/Computer ScienceVehiclesWeaponry
Share12Tweet8Share2ShareShareShare2

Related Posts

Boosting Stem Cell Growth with Testis Scaffolds

Boosting Stem Cell Growth with Testis Scaffolds

August 3, 2025
blank

Intracorporeal vs Extracorporeal Anastomosis Trial

August 3, 2025

Self-Normal, Biorthogonal Phase Transitions in Non-Hermitian Quantum Walks

August 3, 2025

Brain’s Virtual Infection Signals Activate Immune Defense

August 3, 2025
Please login to join discussion

POPULAR NEWS

  • Blind to the Burn

    Overlooked Dangers: Debunking Common Myths About Skin Cancer Risk in the U.S.

    60 shares
    Share 24 Tweet 15
  • Neuropsychiatric Risks Linked to COVID-19 Revealed

    46 shares
    Share 18 Tweet 12
  • Dr. Miriam Merad Honored with French Knighthood for Groundbreaking Contributions to Science and Medicine

    46 shares
    Share 18 Tweet 12
  • Study Reveals Beta-HPV Directly Causes Skin Cancer in Immunocompromised Individuals

    38 shares
    Share 15 Tweet 10

About

We bring you the latest biotechnology news from best research centers and universities around the world. Check our website.

Follow us

Recent News

Boosting Stem Cell Growth with Testis Scaffolds

Intracorporeal vs Extracorporeal Anastomosis Trial

Self-Normal, Biorthogonal Phase Transitions in Non-Hermitian Quantum Walks

  • Contact Us

Bioengineer.org © Copyright 2023 All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Homepages
    • Home Page 1
    • Home Page 2
  • News
  • National
  • Business
  • Health
  • Lifestyle
  • Science

Bioengineer.org © Copyright 2023 All Rights Reserved.